AllMight QMS-Steel
Quality system for steel fabricators (EN 1090)
by computerization4u


One program for the office, the shop and the site
Everything the notified body and the client ask for, in one program: from receiving the steel to erection on site, and in the end the project’s quality dossier in one click.
Quality manager
Inspections, non-conformities, documents, due dates and the project dossier.
Welding coordinator
WPS / WPQR, welders with their qualifications and who may weld what.
Inspectors
Inspection reports on the tablet, with photos and a PIN signature.
Shop and site
Cutting, assembly, welding, painting, dispatch and erection from the phone.
Every project on one screen
The project’s EN 1090 details, its pieces and the production progress, with what the dossier still lacks.
- Execution class, steel grade, toughness, AVCP
- Pieces and welds, also imported from Excel
- Progress per stage, by count and by weight
- Readiness list: what is ready, what is missing


Quality dossier, DoP and CE
The project’s quality dossier comes out in one click, in Greek or English. The client or the notified body gets a link to their project only.
- PDF with cover, index, ITP, inspections, materials, welders
- ZIP with every certificate in numbered folders
- Pre-filled Declaration of Performance and CE label
- Read-only link with expiry and a log of every visit


Inspections on the tablet, signed
The inspector fills the report next to the piece, with photos, and signs with a PIN. A signed report is locked.
- Ready forms: VT, PT, MT, UT, dimensions, blasting, coating, bolts, studs
- Your own forms, no programmer needed
- Even offline: sent as soon as there is a connection
- From a failure to a non-conformity (NCR) in one click


Production from the phone
The foreman scans the piece’s label and taps the stage. Welding is checked: the right welder for the WPS?
- Cutting, assembly, welding, painting, dispatch, erection
- Which heat it was cut from, who welded it, with which WPS
- Welder qualification checked before it is recorded
- Traceability per piece or per weld

QR labels and ITP
Every piece gets a label with a QR code. The project’s inspection and test plan (ITP) starts from a ready EXC2, EXC3 or erection template.
- Labels to print on A4 sticker sheets
- Scanning with the phone’s camera
- ITP from a template, reviewed and approved with a PIN
- Printed on your letterhead


Welding and personnel
WPS with their WPQR, and the welders with their qualifications. The program tells you who may weld to each WPS.
- WPS and WPQR with their files, approved with a PIN
- EN ISO 9606, NDT, IWE and operator qualifications
- Process, joint type, material group, positions
- Trainings, and a notice before a qualification expires


3.1 materials and conditions
Every receipt with its 3.1 certificate and heat number, and the conditions in the paint shop before you paint.
- Supplier, grade, dimensions, heat number
- A photo of the certificate from the phone
- Temperature, humidity and dew point
- A warning when painting is not allowed


Instruments, machines and due dates
Calibrations, maintenance and lifting equipment inspections, with the next date. Every due date in one list and in the morning email.
- Every instrument with its history and certificates
- The next calibration is worked out by itself
- Instruments, qualifications and documents together
- Calendar and a morning email with what is due


Controlled documents
Manual, procedures, forms and the company’s certificates, with revisions. Only what was approved is in force.
- Review and approval with a PIN
- The old revision is withdrawn by itself
- EN 1090 and ISO 9001 certificates with expiry
- Reminder of the yearly review

And also
PIN signatures
Every signature keeps who, when and what was signed. Signed records are locked; changes need a new revision.
Greek and English
Each user picks a language; the dossier and the DoP come out in both.
Even offline
Inspections and production stages are recorded and sent as soon as there is a connection.
Your records brought over
We bring in what you already have: instruments, personnel, certificates, projects, WPS, materials.
Roles
Quality manager, welding coordinator, inspector, foreman: everyone sees and does what is theirs.
Nothing to install
Opens in the browser on desktop, tablet and phone.
Let’s see it in your company
A demo with your own projects, your records brought over, a trial period and set-up by us.
- Monthly subscription
- We bring over the records you already have
- Trial period
- Set-up and training by us